Which kind of agreement covers you
- A company agreement covers the employer's work in one state, such as a large builder's NSW, WA or Victorian agreement.
- A greenfields or project agreement covers one project and is made before anyone is employed on it. A company agreement can step aside for it: one civil contractor's agreement says it does not apply where a project agreement made by it or its joint venture covers the project (BMD cl 2).
- A subcontractor's agreement covers that subcontractor only. A carpenter on a big builder's site employed by a formwork subcontractor is under the subcontractor's agreement or the award, not the builder's.
- A labour hire worker is under the labour hire company's agreement or the award, not the host's. Some labour hire agreements promise the host's higher rates while you are placed there (BNC Workforce cl 24.2(c), (d)).
- An apprentice employed by a group training organisation is under its agreement, which may pay by reference to the host (Plumbing Apprenticeships Victoria cll 24.1, 24.2).
What we usually see
From a sample of 14 current construction agreements approved between March 2023 and November 2026: large builders in NSW, WA and Victoria, civil and rail projects in WA, NSW and Queensland, electrical and plumbing contractors, a labour hire company and a plumbing group training organisation. Each was read at a high level for the terms described, not end to end. A sample, not every agreement: most construction agreements cover one subcontractor, project or joint venture. Always read your own.
- TypicalPay Far above the award on builders' agreements: a Level 3 tradesperson $59.03 an hour from 1 July 2026 (Multiplex NSW) and $62.21 from February 2026 (Hutchinson Victoria), against about $31.22 an hour under the award in general building with the industry allowance. Civil and utilities agreements sit lower: CW3 $43.85 (Laing O'Rourke WA civil), $37.94 (BMD NSW minor works) and $36.31 (Fulton Hogan Queensland utilities), all from 1 July 2026.
- TypicalHours and RDOs A 36-hour week: 8 hours a day, 7.2 paid and 0.8 accrued toward a rostered day off, on a calendar in the agreement (Multiplex cl 14.1; Lendlease WA cll 35.2, 37.1; Hutchinson cl 36.1). The award is 38 hours with 0.4 a day accruing. Utilities and sprinkler agreements sit closer to the award.
- VariesSite and productivity allowances Paid by the hour, by project value: Multiplex a productivity allowance of $4.25 an hour and a site allowance of $2.40 to $4.95; Lendlease WA $2.20 to $5.50. Usually not paid when you go home for wet weather, or only for hours actually worked (Multiplex cll 17, 18; Lendlease WA cl 25).
- VariesWet weather and heat No work at or above 37.5°C under one WA builder's agreement (Lendlease WA cl 34.4(g)); 35°C is inclement weather in Greater Melbourne under a Victorian one (Hutchinson cl 32.3(b)); a conference within 30 minutes (Multiplex cl 9.8). BMD caps wet weather pay at 32 hours each calendar month, against the award's 32 hours in any 4 weeks.
- Watch forLeaving site early Leaving site before the consultation step can forfeit the wet weather payment (Lendlease WA cl 34.4(a), (f)).
- VariesRedundancy Usually through an industry fund with weekly contributions (Incolink, ReddiFund, ACIRT, PROTECT), paid when employment ends; in one, "redundancy" means the end of employment for any reason (Multiplex cl 11.2.1(a)). Others use the National Employment Standards scale and may exclude casuals, "limited tenure" employees and apprentices (Fulton Hogan cll 5.3, 10.1.1).
- VariesProject completion payments A Queensland rail greenfields agreement accrues a Project Legacy Payment of $125 to $350 for each completed week, paid in full on demobilisation, 20% to 50% on resignation after 6 months, and nothing on dismissal (CPB and Acciona cl 6.2).
- VariesAccident pay Can be longer than the award's 26 weeks: Hutchinson pays the gap between workers' compensation and the 36-hour rate for up to 52 weeks (cl 35.2).
- Watch forAll-inclusive rates Section 206 lifts only the base rate, which excludes allowances, but the award's industry allowance is all-purpose. So an agreement can pay more than the award base rate and still less than the award's ordinary hourly rate: one labour hire agreement printed a CW/ECW 3 rate of $29.78 at approval that "incorporate[s] all allowances" (Skilled cll 7.1, 7.2). Check your payslip and any annual review.
- TypicalDrug and alcohol testing An appended testing programme, often by oral fluid (Multiplex Appendix 6); one bars testing or discipline until the worker has done the initial training (TFG Appendix M cl 3.6).
- TypicalDisputes Ending in binding arbitration by the Fair Work Commission (Multiplex cl 8; Lendlease WA cl 10.4), or in Victoria by the Victorian Building Industry Disputes Panel (Hutchinson cl 11.3).
- Watch forExpiry Many builders' agreements reach their nominal expiry in July 2027. Nominal expiry is not the end: an agreement keeps operating until it is replaced or terminated.
See the agreements we read (14)
Check your own agreement
Four steps. You can do the first two in five minutes.
- Find itSearch the Fair Work Commission's agreement search by the employer's legal name and, for a big job, the project name. Ask the site office or payroll which agreement applies; it must be available at the workplace.
- Read the approval decision firstThe first pages of the PDF are the decision: operative date, nominal expiry, any undertakings and added model terms.
- Compare it with the awardBase rate, all-purpose industry and tool allowances, RDO accrual, wet weather, fares and travel, accident pay and redundancy.
- Check the fundsAsk the redundancy fund, the portable long service leave scheme and your super fund for the contribution history. A missing contribution is an underpayment.
Where agreements and the award differ: the traps
- The award floor protects only the base rate. If an agreement's base rate is below the award's, the agreement operates as if it were equal (s 206). The base rate excludes loadings, allowances and penalties (s 16). Because the On-site award's industry allowance ($67.15 a week, or $53.72 residential) is all-purpose, an all-inclusive agreement rate can sit above the award base rate and still below the award's ordinary hourly rate.
- Redundancy may not follow the National Employment Standards. They do not apply where the award's industry scheme applies, or where an agreement takes the scheme in by reference (s 123(4)(b), (c); Laing O'Rourke cl 13.1). Other agreements use the Standards' scale with exclusions. Apprentices are outside the Standards' redundancy pay in any case (s 123(4)(a)).
- Undertakings and added terms change the text. One agreement was approved only with undertakings on apprentice rates, the shiftworker definition and leave evidence, and with the model flexibility and consultation terms taken to be terms ([2026] FWCA 2950 at [4] to [8]).
- RDO calendars can clash with a new public holiday: in April 2026 the Commission decided to vary 25 NSW builders' agreements over the new 27 April public holiday ([2026] FWCA 934).
- A breach of an agreement term is a contravention of s 50 and can be recovered in court like an award underpayment. A dispute about what a clause means goes through the agreement's dispute clause first.