Construction · Underpayment

A flat rate for all hours rarely covers the award.

Where construction workers are most often underpaid, how to recover it from the company or a director, and what you can still get when the builder or subcontractor goes into liquidation.

A tiler reads a letter on the step of a house under renovation.
6 yearsto claim unpaid wages from each underpaid pay day
$100,000the most the small claims procedure can award
13 weeksof unpaid wages the Fair Entitlements Guarantee can cover

Time limit Unpaid wages can be claimed in court for 6 years from each underpayment (Fair Work Act s 544). If your employer has gone into liquidation, a Fair Entitlements Guarantee claim must be made within 12 months after the later of the insolvency and the end of your job (FEG Act s 14(2)).

Most construction underpayments are not about the minimum rate in the award table. They are about everything that should sit on top of it: the all-purpose allowances, the daily hire loading, overtime worked out on the wrong rate, travel, wet weather, rostered days off, leave loading and redundancy pay. And because insolvency is common in construction, it matters who else can be made to pay.

Where construction workers are underpaid

  1. The hourly rate. Paying the classification table rate leaves out the all-purpose industry allowance ($67.15 a week general, $53.72 residential), any tool allowance ($9.89 to $41.22 a week) and, for daily hire, the 52/50.4 loading (On-site award cl 19.3, 21.1, 22). For a carpenter in general building that is the difference between $29.45 and, worked from the 1 July 2026 amounts, about $32.30 an hour on weekly hire or $33.33 on daily hire. See Awards and pay.
  2. Overtime and weekends on the wrong base. Overtime is 150% then 200% of the ordinary hourly rate (cl 29.4), and Saturday afternoon and Sunday 200% (cl 30.1). Paying penalties on the table rate, or on an "all-in" rate below the true ordinary rate, underpays every hour. In one case an employer that had paid overtime on the actual rate it paid could not argue afterwards that only the award rate was due ([2014] FCCA 1374 at [22] to [24]).
  3. Travel. The fares and travel pattern allowance of $22.41 a day (cl 26.1), paid travel between sites (cl 26.2), the distant work payment (cl 26.4) and paid travel to remote sites (cl 25.6). In a 2026 Federal Court case an apprentice was not paid 8.25 hours of travel to and from an island site, or the travel pattern allowance on 32 days worked on Adelaide-area sites ([2026] FCA 734, declaration 3).
  4. Wet weather and RDOs: up to 32 hours' pay in 4 weeks for weather stoppages (cl 24.7), and 0.4 hours a day accruing to a rostered day off, paid out on termination (cl 16.2, 16.7).
  5. Annual leave loading of 17.5%, including on leave paid out at the end (cl 31.2(b)). "Industry practice" that an over-award rate covers it is not enough without an agreement.
  6. Redundancy pay on every exit except misconduct or refusal of duty, once you have 12 months' service. In the first year it is due only where the employer ends the job, and casual service does not count (cl 41.2, 41.3(b), (e)). See Redundancy and the end of a project.
  7. Superannuation on the wages actually owed, not only those paid, and payslips within one working day of payday (s 536).
  8. Contractors who are really employees are owed all of the above, and a flat contractor rate is credited only against the entitlements it was shown to cover. See Sham contracting and the ABN trap.
  9. Pay timing: wages must be available by the end of ordinary hours on Thursday each week, unless an older pay cycle was preserved (cl 20.3, 20.4).

How to recover it

  1. Write to the employer with your calculation. Keep your own diary of start and finish times, sites and travel.
  2. Complain to the Fair Work Ombudsman, which can investigate and issue a compliance notice. A court will enforce the notice, with penalties, if the employer ignores it.
  3. Claim in court: the Federal Circuit and Family Court (Division 2) or a state magistrates court, within 6 years of each underpayment (s 544). The small claims procedure is informal and can award up to $100,000 (s 548(2)).
  4. Name the people involved. Anyone "involved in" a contravention, such as a director, payroll manager or site manager who set the rates, can be personally liable (s 550). This matters most when the company is about to fail.
Read moreShow less

From 1 January 2025, an employer that intentionally engages in conduct that results in a failure to pay a required amount in full when due commits a criminal offence, with maximums including 10 years' imprisonment for an individual (s 327A). Prosecution is for the Commonwealth, not you, but it is a reason a builder settles.

When the builder or subcontractor goes broke

Act quickly. Lodge a proof of debt with the liquidator, and keep pressing directors personally where s 550 applies. Phoenix arrangements, where a new company takes over the work, are common in construction.

Read moreShow less

If an insolvency event has happened to your employer and the liquidator cannot pay, the Commonwealth's Fair Entitlements Guarantee may advance your unpaid entitlements:

  1. eligibility: your employment ended because of the insolvency, less than 6 months before an insolvency practitioner was appointed, or after the appointment; you are owed employment entitlements and have taken reasonable steps to prove the debt; and, when your employment ended, you were an Australian citizen or held a permanent or special category visa (FEG Act s 10(1)). Temporary visa holders are not eligible;
  2. what it covers: unpaid wages for up to 13 weeks before the end (s 5), annual leave, long service leave, payment instead of notice up to 5 weeks (s 22) and redundancy pay up to 4 weeks for each full year of service (s 23), with a maximum weekly wage rate applied (s 26, and s 27 for wages). The figure is set each year: check the Fair Entitlements Guarantee website;
  3. the claim must be made within 12 months after the later of the insolvency event and the end of your employment (s 14(2));
  4. it does not cover unpaid superannuation (the ATO pursues that), and it is not available to genuine contractors.

Construction has its own safety nets that survive the employer's failure:

  1. your industry redundancy fund pays out your balance; under the award, the fund benefit counts against the award redundancy pay (On-site award cl 41.4);
  2. your portable long service leave credits sit with the state scheme, not the employer: see Portable long service leave;
  3. workers' compensation continues through the insurer, though accident pay is the employer's own liability (cl 27).

An employee of a failed subcontractor may have no wage claim against the head contractor, which was not the employer. You may have one if the "subcontractor" only supplied labour and the head contractor was really running your work, if the head contractor was knowingly involved in the underpayment (s 550), or if the project agreement requires the head contractor to ensure subcontractors pay their workers. Check those, and get advice, before writing it off.

Decided cases from construction

What the Commission and the courts decided.

Published decisions of the Fair Work Commission and the courts, retold in plain English from the decision itself. Lawcaptain did not act in these cases. Each links to the full decision.

Contraventions foundFederal Circuit Court of Australia · 9 August 2013

A blocklayer was paid one flat rate for every hour; the regulator claimed the bricklayer rate.

A blocklayer on building sites was paid a flat $21.17 an hour for all hours worked. The building inspectorate brought a claim at the bricklayer's award rate.

Read the full storyShow less

Result. Contraventions found, including failing to produce records; $2,947.41 owing on one claim; penalties to be argued.

The worker laid blocks on building sites and was paid a flat $21.17 an hour for every hour, whatever the day or the time. The claim was brought at the bricklayer's rate under the award ([3], [4]).

The Court found contraventions, including the employer's failure to produce records, and found $2,947.41 owing on one claim. Penalties were left to be argued ([45] to [47]).

What it means for you

A single flat rate for all hours is a red flag on a building site: it often does not cover overtime, weekend rates and allowances. Keep your own diary of start and finish times, because the employer's records may be missing.

For employers

If you run a construction business

  • Audit the ordinary hourly rate. Check it against cl 19.3 for every classification and sector (general, residential, civil), and pay every penalty and overtime hour on it.
  • Pay travel allowances and RDO accruals. On exit, pay out RDOs, leave with loading and redundancy pay after any fund credit.
  • Give payslips within one working day. Showing the allowances separately, and keep time records. Missing records count against you in court.
  • Directors are personally exposed. For underpayments they know about (s 550), and deliberate underpayment is now a crime (s 327A).
For unions and delegates

For unions and delegates

  • On an insolvency, move early. Get members' Fair Entitlements Guarantee and fund claims lodged, and check that super and fund contributions were actually paid in the last year. A union can appeal penalties that are too low, even after the company goes into liquidation.
Leading cases

The decisions that set the rules.

A blocklayer paid a flat $21.17 an hour for all hours; contraventions found, including failing to produce records.

An employer that had paid overtime on the worker's actual rate could not fall back on the award rate; industry practice did not make over-award pay cover leave loading.

Show all leading cases (3)Show fewer

On the union's appeal, a director's penalty of $500 a contravention for a painter's underpayment was manifestly inadequate; the penalty orders were set aside for penalty to be decided again.

An electrical contractor that ignored a compliance notice for a former employee's $14,196 underpayment was penalised.

A roofing company worker's small claim under the On-site award: judgment for $6,789.73 for wages, overtime, annual leave and loading.

Questions

The things people ask.

My builder went into liquidation owing wages. What can I get?

Lodge a proof of debt with the liquidator. If it cannot pay, the Fair Entitlements Guarantee may advance up to 13 weeks of unpaid wages, annual and long service leave, up to 5 weeks' notice and up to 4 weeks' redundancy pay for each full year, if you are an Australian citizen or hold a permanent or special category visa. Claim within 12 months (FEG Act s 14(2)). Your redundancy fund and portable long service leave credits survive the employer.

Can I claim against the director personally?

Yes, if the director was involved in the contravention, for example by setting the rates or the pay system (Fair Work Act s 550). That is often the only route when the company has failed.

Can I claim against the head contractor when my subbie doesn't pay?

Often not, because the head contractor was not your employer. You may have a claim if the subcontractor only supplied labour and the head contractor ran your work, if the head contractor was knowingly involved in the underpayment, or if the project agreement makes it responsible. Check those first.

How far back can I claim?

6 years from each underpaid pay day (Fair Work Act s 544). The small claims procedure can award up to $100,000 (s 548(2)).

Is underpaying wages a crime now?

Intentional underpayment is, from 1 January 2025 (Fair Work Act s 327A). The Commonwealth prosecutes; your own claim for the money is separate.

Free discussion · no obligation

Talk to us.

Call 1300 967 552, or leave your details and we will call you.

Do it yourself with AI